Drill a 1 1 2 inch deep hole in the wall on each pencil mark with a hammer drill and a masonry bit that is the same dimeter as a metal screw anchor sleeve.
How to sheetrock a concrete wall.
They want drywall on the existing studs but that moves into the poured wall section.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
So you would have to separate the concrete from the drywall with either treated wood furring or metal studs or properly seal the concrete wall to prevent moisture migration.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Tap a sleeve into each hole with a.
The concrete stairsteps from front to back where the back is all studs and no poured concrete.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make sure you ve spaced the hat channels properly for the size of drywall and insulation you re using.
The basement has poured concrete walls in combination with 2x6 plates and studs.
You can glue drywall sheets to a concrete block wall.
Drywall is usually attached to wall studs with 2 inch drywall screws using an electric drill with a driver bit installed.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Even with sealing the concrete i wouldn t fasten it directly to the concrete.
Mark hole locations through the furring strip using a pencil or marker.
Measure down the length of the concrete wall at top bottom and middle.
Mark the wall every 16 inches which is standard stud placement in any wall.
Sheetrock needs to be kept dry to avoid mold growth and possible material degradation.
Drill pilot holes into the concrete with a 5 32 inch masonry drill bit in a hammer drill.