Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
How to replace shingles on roof ridge.
Loosen and remove the damaged shingles.
For most asphalt shingle ridge caps there are two nails in each ridge cap one on either side of the ridge.
The vent manufacturers make their products to match the size of the cap shingles so the caps cover the vent material leaving.
The cap shingles often are installed on top of a continuous ridge vent.
Start by removing the nails holding the ridge cap shingles in place.
Chalk lines should be used to help ensure clean straight professional looking shingle ridge cap installation.
If the shingles are severely damaged don t try to salvage them.
To finish a shingle ridge cap you should set.
Insert a flat pry bar under the shingle cap and lift up on both the shingle and the nail head to loosen the nail then pry out the nail.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Step 4 snap chalk line.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Step 5 install roof.
Remove the shingle cap.
If you need to replace some of the caps here s how to do it.
Step 2 cut shingles.
Since ridge cap shingles have to be formed over the ridge the shingles.
You should lay them in stacks near the ridge so.
Terminating ridge shingles more storm damage from hurricane irma.
Step 3 wrap shingle over ridge.
Loosen the adhesive underneath the tabs of the damaged shingle then pull them free and discard.
Overlap the shingles to cover the nails on the.
This ridge just had 8 shingles missing.
Collect the number of shingles that will be needed for the roof ridge.
Install new flashing metal.
How to install shingles on a roof ridge.
Ensure the shingles aren t too cold.
Overlap each row at least 3 to 4 inches.
Just remove them and replace them with new shingles of a similar style to the rest of the shingles on the roof.
Start by laying asphalt felt or other underlayment over the roof.
Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge.
Step 1 prepare shingles.